Wednesday, 13 March 2013

Playmat flimsy four and five

I had a bit of help this time, most unusual...
All five sewn up now, let the quilting commence!

Sunday, 10 March 2013

What a wind-up!

 





More sorting through the room full of stash-today, I tackled the yarn.   
I used to buy sacks of bin-ends, cones of 1 and 2 ply yarn, to make Kaffe Fassett jumpers.  Today I wound 5 strands to make DK yarn for a jumper, balls numbered so the colour mix flows when I get round to knitting it up.  It barely scratched the surface of whats there!











I took the pink-red-coral-lavender downstairs and wound these balls to crochet into Aran weight chevron blanket whilst I watched Mr Attenborough's 'Africa'.




 







Evenings have been spent on hand quilting 'Kiss in the Corner'-I have almost reached an edge, I feel progress is being made!


Saturday, 9 March 2013

Taking stock

I made a good resolution not to buy fabric this year. 
after all the upheaval of decorating and moving rooms around, I shoved everything in the small bedroom as I had to get my sons room clear (he's home!) 
Yesterday I bought two of the biggest storage boxes I could find, 64 litres, thinking I would get lots of fabric in these. I have only just crammed the black and whites into one box.  
There's a whole 6 ft x 10 ft room of this stuff to sort yet!


Saturday, 2 March 2013

Kitting up the charity playmats

I have kitted up four this evening: they will finish at 40".  These play mats are for children with varying levels of learning disability, their 'safe' learning place.

The Big Clean-up!

I finished slicing this afternoon.  Some of the charity quilts will be basic 4" finished squares, some bricks and  I plan some stars to practice my flying geese accuracy. Then I'll tackle the tactile quilts.

 I have always felt that small quilts are somehow 'cheating' but after making the baby quilt I can now see how they are useful for practice.

I took the 'pledge' at Rossieblog-see the button top right.

I have pledged with 862 others: 

The goal of the process pledge is to create a new sensibility in quilting blogs where we don’t just show finishes or occasionally confess about our moments of indecision, but chat openly and often about our works in progress, our inspirations, and our moments of decision.

So please fee free to comment and offer me insights!

The links to all the other bloggers are on her page, just click the button (later!)

I have to admit to a small misdemeanor with regard to  my new years resolution: I was buying thread from
and they have started selling fabric. 

 I only bought 1 metre in the sale-the one I really wanted for making the crossbars in my planned churn dash quilt was out of stock, or it would have been 4 metres! 

The triangles for this will be leftover greens and greys that are already sewn up for moth in the window and the big green one.

Yet ANOTHER project!  But I am using up orphan blocks, so I guess that's OK.....

 I really don't know why this block appeals to me so much-when I make this quilt it will be for me!  I think I need a striped fabric for the bars, a strong look. 

I have a huge box of crumbs and strips left over from the latest round of slashing.

 I have an idea to use the crumbs in a raw edge way for one of the tactile quilts that I will wash to create texture before I send it off. 



Wednesday, 27 February 2013

On the cutting room floor

I've been cutting some 4 1/2" squares for the charity quilts from the 'not so pretties' I want to use up and 'large lengths'. I have to tidy up various piles of fabric before son number two arrives next week from his three month break in the far east.
I cut some strips for the bins too and some
4 1/2 x 2 1/2" bricks......










And some hexies whilst the fabric was on the table, for the brown flower garden/random hexie.........



and Darwin's flower garden.......

..........and the stash of diamonds for baby blocks-these are from the same size strips, 2 1/4", as the hexies.There are piles of cut things everywhere.

Of course, the waste string/crumb bin is now overflowing and needs sorting.  Job for another day!  I'm itching to start the charity quilts as I want to make a couple to practice my machine quilting before I do the moth in the window quilt. 

Saturday, 23 February 2013

O.M.G. I finished something!!!

The bow ties baby quilt for a colleague, finishes at 35" x 25", small baby/play mat size.  Bow tie blocks are 3" square. 

I really liked hand sewing the binding on!  I chose black spotted yellow in the end, it picked up the yellow ice cream and currants in the backing-see previous post-and doesn't overwhelm the front.

Hope baby likes it.

Tuesday, 19 February 2013

Quick, quick!

I have put together a baby quilt, from the bow tie stash.  It's all a bit of a panic as this is the only time I will have before the end of the month. Wish I'd had more time!

 


I quilted it with the walking foot rather than free motion: although the curves weren't supposed to be symmetrical, they were too tight for the walking foot really and are more uneven than I intended!

 


The sex of the baby is unknown, hence the random colours.  I cut the trusty ice cream fabric for the backing but now its on I realise its rather PINK!  I used a variegated green on the back to quilt. picking up the ice cream green and trying to offset the pink. I like the quilting on the back more than the front!

The front is sewn in a heavyweight rainbow dyed variegated.  It needed a lot of quilting as it will probably get a lot of washing.  Either the thread was poor quality (it was rather furry) or the eye in the needle was too small (probably) as every so often it would break down and fray in the eye, so I have a few ends to secure.

I learned a lot doing this quick project.  As time was so tight I didn't have time to worry if it was 'right' or good enough, my usual train of thought for most things.  Probably why I'm not a great 'finisher'!




Not sure what to use for the binding, don't want to 'pink' out the front with ice cream fabric! I will try to find a brown or an almost white cream.  Or yellow.



Sunday, 10 February 2013

Refuel necessary!

I have done very little sewing for a couple of weeks, very little anything.  A series of migraines has floored me (:¬/

A little bit of this is all
Altogether, I will have just over three of these tins of rosette sets with papers in when I'm done.  There are already a lot sewn up
ready for the Grandma's flower garden I'm working on
I have way more than I need to compete this quilt as I only have to square it off in the red, orange, green and blue sectors.  Enough, for another quilt, methinks!

Probably not much sewing on the next two weeks either as I have to finish decorating before my son comes home from 3 months in the Far East, his bedroom is full of furniture from the area I'm decorating!

Monday, 28 January 2013

TBGO

Sewing the two-patches into four-patches is easy (but monotonous!), as the hand sewn ones had been bagged up tightly with the seams folded towards the green side for about two years so there was a nice firm crease.  I just had to butt the seams together and feed them through.  I did not hand sew to the edges of the patches, I left 1/4" seam allowance, so it will be really easy to spin the seams at the centre of the four patches. I just have these few to go......





....... these are done, I'm sure there are way more than I need, they will be bagged up for another project if so.


The joy of snipping all these is ahead!







I have started to iron all the triangles for TBGO, but that's a gutty job too!  I can see why Bonnie did this as a leaders and enders project rather than the main focus project! Very glad I had all the pieces cut and ready to go. This is about 1/4 of the pile.


 

Saturday, 26 January 2013

It's the 26th..........

.............and despite getting three or four
 emails a week regarding fabric
 sales, I haven't succumbed once, 
not even so far as looking at a website!   
Only 48 1/2 weeks to go.





There is a catch!.
 
This is it .
My daughter in law liked it.  So I thought I would make it for her (don't ask me WHEN!), so I looked for the wool on line.   I thought it may suit me too.  

 
We both liked this colour:
 then I browsed the sale section.  Oh dear. 

I love random yarns especially ones with varying lengths of colour.  In cotton.

I have been hankering to do some knitting for a while (ten years ago it was my main pass-time instead of quilting).  Now I have 5 garments to knit!


Another thing to add to my 'must not buy (any more) this year' list.  
 

My son gave me an Amazon voucher for Christmas, so I spoilt myself and bought a book I had been coveting for a while.  I have read the stories associated with the blocks in the book already but the quilt will be on the back burner.  As there are so many individual blocks to cut I think I will make two of each, one in black and white and one colour. If you are going to the trouble of making 145 different blocks for the largest version then it makes sense to cut at least two!









Friday, 25 January 2013

The Big Green One returns

This is about half of my hand sewn ugly green two patches that will be made into 4 patches on the machine for 'The Big Green One', hereafter known as TBGO.  I laid them out so I could see what I had and get a good mix in the four patches.  I paired and paired and paired this evening.  Then I found a few hundred I had done on the machine in different greens, so I paired those. Then I sewed and sewed. I have done a lot but barely seemed to have scraped the surface!

You can see the hand sewing here, I just got fed up with it!  I think it was because I was sewing 2" squares to 2" squares for too long.  Yes, I ruled every one of those cream squares (and more) that you can see in the other photo to get my seam allowances right.     All four sides.  Ho hum.







The pairs have turned into The Big Green Snake......there is another one about the same size lurking in a box!


I'm going to have to take a run at this or I will loose interest in this part of the project- I have been sewing 2" squares together for what feels like weeks on the machine, in bow ties and mauve mini moths!

I may have to stop if they are not done by next weekend as I will only have two weeks to make-at least to flimsy stage- a tactile quilt top.  It will only be about 40" square and most of the fabrics are assembled, so it's achievable.

That's me set for the weekend. Back to it.  Listening to 'The Girl Who Played With Fire' on audiobook whilst I sew, 18 discs!






Thursday, 24 January 2013

Part 2 from the weekend

I have been struck down. The dreaded migraine!  I won't bother you with the details but after three days I am feeling better.

So, here is the rest of the mini moth saga.......

I smoothed the top, measured the top, whoohoo, it is EXACTLY the same across the middle in both directions!  Miracle!

I measured the moth strips, it worked out OK..........but it wasn't right, the moth strip was too tight  once sewn on and whats more I didn't like it once I had laid the outer border next to it.

Now what? After making about 150 mini moths, don't use them?!


 Well, this looks OK, but its a bit boring.

I had attached the minis in the same direction as the big moths as I thought it would look too busy as it's a scrappy quilt if everything was going off in all directions.   So I tried  it another way...




Actually, that's better.

I sewed the mini moth strips on after pressing them, letting them lay as they wanted, not measuring.  No puckers!



Only trouble is......now there are odd ends-one worked out OK, two are about 1 1/2" out (half a mini moth).  I can make some odd size moths to go in there.  Hoping  the issue is with the mini moths along one side, not the quilt being out, though it WAS OK when I measured it!

The quilt will be about 104 x 104" so you won't see if it IS a bit skewed!

Now these are on I can see the light.  Three midi moths to make and the outer border to go on, then layering.





Monday, 21 January 2013

Almost a flimsy.....










Mini moths ironed and pieced into four strips..........






 



.............and about 20 bow ties made in the process.



The top is ironed and ready to smooth out and measure  to find the final cutting dimensions of the mini moth border sections: I should be layering this next week!  

Looking forward to my first machine quilting experience.